Riverside,
3 First Wood Street
Nantwich
Cheshire
CW5 5EG
LOCATED IN THE HEART OF THE DESIRABLE VILLAGE OF AUDLEM this two bed detached bungalow is in immaculate condition and viewing is highly recommended.
Accommodation comprises; entrance hallway leading to large lounge to the front of the property. The kitchen is fitted with light oak units offering plenty of storage. Freestanding cooker with extractor hood above and space for under counter fridge and freezer. Small dining room leads to conservatory and on to the enclosed rear garden which is laid to lawn and borders.
Two double bedrooms and bathroom with shower over the bath.
Integral double garage with electric up and over garage door. The garage has a sink unit, plumbing for a washing machine and space for tumble dryer along with a side door that leads to the rear garden.
Audlem village is a most highly regarded and sought after historic village within South Cheshire nearby to the North Shropshire border and provides all the requisites of village life with medical and schooling facilities, shops and services for day to day requirements and good road links to surrounding areas. Nearby Nantwich is a charming and historic market town in South Cheshire.
The property has oil fired central heating and upvc double glazing.
Rent excludes all utilities and is council tax band D
Although these particulars are thought to be materially correct their accuracy cannot be guaranteed and they do not form part of any contract.
Property data and search facilities supplied by www.vebra.com